top of page
MENU
Institute for Brick and Tile Research
before application
after application
Application
Batch Kiln
Location
Essen, Germany
Substrate
Ceramic Fiber
- about 30 years old
Client
Institute for Brick and Tile Research
Emisshield Benefits
6% reduction in gas consumption
After 3 years of operations the coating is still fully intact
Note: this coating becomes transparent after firing.
Furnace Information
Furnace type: Batch kiln, volume about 600 liters
Fuel type: natural gas, hydrogen
Operating Temp: 1100 °C (2010 °F)
Application Information
In August 2020 the walls were coated with Emisshield Ceramic fiber coating. The furnace was loated with about 50kg of bricks and heated up. Gas consumption was compared to same settings as prior Emisshield installation.